ShopDreamUp AI ArtDreamUp
Deviation Actions
Suggested Deviants
Suggested Collections
You Might Like…
Featured in Groups
Description
At 7 september 2009 the NS (Dutch Railways) and the NMBS (Belgian Railways) started the use of these TRAXX locomotives for the Fyra.
This because the V250, the train that was supposed to become the Fyra wasn't done in time.
The V250 was meant to enter the timetable, but because there were problems (a lot) with the Italian Highspeed-train.
(so if you hear someone complain about the Fyra, they're complaining about the V250, not this loc.)
One year later the TRAXX loc's are still pulling the Fyra carriges, especially the in-country services in the Netherlands.
This papercraft train isn't in-scale with my other trains, for that you have to edit the size.
This because the V250, the train that was supposed to become the Fyra wasn't done in time.
The V250 was meant to enter the timetable, but because there were problems (a lot) with the Italian Highspeed-train.
(so if you hear someone complain about the Fyra, they're complaining about the V250, not this loc.)
One year later the TRAXX loc's are still pulling the Fyra carriges, especially the in-country services in the Netherlands.
This papercraft train isn't in-scale with my other trains, for that you have to edit the size.
Image size
844x736px 193.24 KB
© 2013 - 2024 Tim1995
Comments0
Join the community to add your comment. Already a deviant? Log In